Korea: KOSPO Invites Tender for Purchase of 320,000 MT Coal

Korea Southern Power Co Ltd (KOSPO) a Republic of Korea power producer having its head office in Busan, Korea has published a tender for purchase of steam coal of quantity 320,000 MT for its 4,000 MW Hadong power plant, South Korea.

Each bidder is requested to offer to offer 110,000MT ~ 160,000 MT in lots of 55,000 MT ~ 80,000 MT on FOBT basis.

Quantity and Shipping Schedule:

Quantity Loading Schedule Bid Price
160,000MT

(80,000MTx2Panamax)

FOBT : August, 2018

CFR(Unloading) : August 2H ~ September 1H, 2018

One single fixed number(USD)

based on FOBT or CFR

At Bidder’s choice

160,000MT

(80,000MTx2Panamax)

FOBT : September, 2018

CFR(Unloading) : September 2H ~ October, 2018

 

Specification:

Technical Parameter Value
Total moisture (as received basis) Max. 28
Fixed carbon (air dried basis) Max. 60
Ash (air dried basis) Max. 17
Net calorific value (as received basis) Min. 4,500 kcal/kg
Ash fusion temperature Min. 1,100

 

The offer given by the bidder shall be valid for the period 3 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.

Due date:
The due date for bid submission is 25 May’18 at 13:00 hrs (Korean Standard Time).