State-run miner, Coal India Limited (CIL), registered 6.4% year-on-year increase in coal production during Feb’17, in which CIL had produced 54.32 MnT. CIL had produced 51.01 MnT in the same month of the last fiscal.
A similar trend is also displayed during the Apr-Feb’17 period, during which CIL produced 488.04 MnT, overtaking the production in the corresponding period of the last fiscal at 477.31 MnT by 2.3%.
| Quantity in MnT | |||||||
| SUBSIDIARY | Feb’17 | Apr-Feb’17 | |||||
| Target | Actual | %Achievement | Target | Actual | %Achievement | %Growth | |
| ECL | 4.95 | 3.88 | 78 | 41.64 | 35.9 | 86 | 2.3 |
| BCCL | 2.78 | 3.41 | 123 | 33.76 | 32.82 | 97 | 2.6 |
| CCL | 7.1 | 7.23 | 102 | 58.45 | 55.39 | 95 | 3.9 |
| NCL | 6.38 | 7.65 | 120 | 74.94 | 75.23 | 100 | 4.8 |
| WCL | 4.84 | 5.67 | 117 | 42.46 | 37.43 | 88 | -5.4 |
| SECL | 14.09 | 13.56 | 96 | 133.96 | 125.19 | 93 | 3.1 |
| MCL | 16.5 | 12.81 | 78 | 149.36 | 125.64 | 84 | 1.4 |
| NEC | 0.18 | 0.108 | 62 | 0.81 | 0.44 | 55 | 32.8 |
| Total CIL | 56.82 | 54.32 | 95.60 | 535.38 | 488.04 | 91.16 | 2.3 |
Source: CIL
However, the productions during Feb’17 and Apr-Feb’17 trailed behind the respective targets of 56.82 MnT and 535.38 MnT.
Likewise, off-take during Feb’17 was higher by 4.8% in comparison with that in Feb’16. In Feb’17, CIL sold 47.73 MnT against the sales of 45.53 MnT in the same month of the last fiscal.
During the Apr-Feb’17 period, CIL sold 490.85 MnT, which was marginally higher by 1.6% over the sales at 483.14 MnT in the first 11 months of the last fiscal.
| Quantity in MnT | |||||||
| SUBSIDIARY | Feb’17 | Apr-Feb’17 | |||||
| Target | Actual | %Achievement | Target | Actual | %Achievement | %Growth | |
| ECL | 4.01 | 3.77 | 94 | 42.37 | 38.85 | 92 | 12.6 |
| BCCL | 2.95 | 2.84 | 96 | 33.85 | 31.73 | 94 | -3.2 |
| CCL | 5.5 | 5.82 | 106 | 60.5 | 54.34 | 90 | 0.3 |
| NCL | 7.05 | 7.12 | 101 | 74.38 | 75.45 | 101 | 6 |
| WCL | 4.25 | 3.98 | 94 | 43.38 | 35.21 | 81 | -8.7 |
| SECL | 12.74 | 12.31 | 97 | 134.78 | 124.52 | 92 | 0.1 |
| MCL | 14.03 | 11.84 | 84 | 150.17 | 130.06 | 87 | 2.3 |
| NEC | 0.09 | 0.05 | 54 | 0.9 | 0.69 | 76 | 111.4 |
| Total CIL | 50.62 | 47.73 | 94.29 | 540.33 | 490.85 | 90.84 | 1.6 |
Source: CIL
SCCL’s FEB’17 PRODUCTION 9.3% HIGHER Y-o-Y
The Singareni Collieries Company Limited (SCCL) had crafted a record in Feb’17, producing 5.87 MnT of coal that was 9.3% higher than the production of 5.37 MnT in Feb’16.
Out of the production in Feb’17, SCCL had dispatched 5.7 MnT, which was also higher by 26.1% over the dispatch of 4.52 MnT in the same month of the last year.
Furthermore, SCCL’s production during the Apr-Feb’17 period was at 54.16 MnT, over achieving the target of 52.44 MnT. In a similar fashion, the dispatch during the period also surpassed the target. SCCL dispatched 54.37 MnT during Apr-Feb’17 against the 52.35 MnT target.

Leave a Reply