Korea Southern Power Co Ltd (KOSPO) a Republic of Korea power producer having its head office in Busan, Korea has published a tender for purchase of steam coal of quantity 320,000 MT for its 4,000 MW Hadong power plant, South Korea.
Each bidder is requested to offer to offer 110,000MT ~ 160,000 MT in lots of 55,000 MT ~ 80,000 MT on FOBT basis.
Quantity and Shipping Schedule:
| Quantity | Loading Schedule | Bid Price |
| 160,000MT
(80,000MTx2Panamax) |
FOBT : August, 2018
CFR(Unloading) : August 2H ~ September 1H, 2018 |
One single fixed number(USD)
based on FOBT or CFR At Bidder’s choice |
| 160,000MT
(80,000MTx2Panamax) |
FOBT : September, 2018
CFR(Unloading) : September 2H ~ October, 2018 |
Specification:
| Technical Parameter | Value |
| Total moisture (as received basis) | Max. 28 |
| Fixed carbon (air dried basis) | Max. 60 |
| Ash (air dried basis) | Max. 17 |
| Net calorific value (as received basis) | Min. 4,500 kcal/kg |
| Ash fusion temperature | Min. 1,100 |
The offer given by the bidder shall be valid for the period 3 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.
Due date:
The due date for bid submission is 25 May’18 at 13:00 hrs (Korean Standard Time).
For contact details and other information view TENDER SECTION

Leave a Reply