POSCO has decided to resume shipping by land from the Pohang and Gwangyang steelworks from today, which was suspended due to a truckers’ strike. About 300,000 t of shipments were delayed due to the strike. The wire rod and cold-rolling mill at Pohang works are set to resume from 16 Jun’22. Estimated production loss is around 36,000 t, including 23,000 t of wire rod and 13,000 t of CR steel.

Leave a Reply