Korea Western Power Company Limited (KOWEPO) has published a tender for the purchase of 456,000 MT steam coal for its TAEAN Power Plant, Korea.
Delivery coal begins from 10th June to 15th July. Shipment of SP-1 is on FOBT basis and Shipment of SP-2 in on CFR basis.
Shipment Size & NCV :
– SP-1 : 76,000MT +/-10%, Min.5,700 kcal/kg
– SP-2 : 76,000MT +/-10%, Min.5,700 kcal/kg
NOTE: SP-1 Only Colombian coal and Western Russian coal are allowed to participate in SP-1.
Specification:
| Parameters | Limit of Range |
| Total moisture (as received basis) | Max 15 |
| Ash (air dried basis) | Max 17 |
| Net calorific value (as received basis) | Min 5,700 |
| Ash fusion temperature | Min 1,200 |
Submission of Bid Documents:
The Bid documents shall be submitted through the designated e-mail address (bidding@iwest.co.kr) and arrive not later than the closing date.
Due date (Korean Standard Time):
10:00 a.m., March 13, 2019. (KOWEPO Server’s Korean Standard Time)
For more details PFA.