Korea Southern Power Co Ltd (KOSPO) has published a tender for purchase of coal of quantity 580,000 MT for Hadong power plant, South Korea for the period of three year, till June 2020.
Each bidder is requested to offer min 290,000 MT in lots of 145,000 MT on FOBT basis.
Specification:
|
Technical Parameter |
Value |
|
Total moisture (as received basis) |
Max. 15 |
|
Fixed carbon (air dried basis) |
Max. 60 |
|
Ash (air dried basis) |
Max. 17 |
|
Net calorific value (as received basis) |
Min. 5,700 kcal/kg |
|
Ash fusion temperature |
Min. 1,200 |
The offer given by the bidder shall be valid for the period 14 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.
Due date:
The due date for bid submission is 20 OCT’17 at 10:00 hrs (Korean Standard Time).
For contact details view tender section:
http://www.steelmint.com/tender/global-tender-for-purchase-of-coal-8497