Korea Southern Power Co Ltd (KOSPO) has published a tender for purchase of steam coal of quantity 320,000 MT for Hadong power plant, South Korea.
Each bidder is requested to offer 320,000MT per year in lots of 80,000MT on FOBT basis.
Specification:
| Technical Parameter | Value |
| Total moisture (as received basis) | Max. 43 |
| Fixed carbon (air dried basis) | Max. 60 |
| Ash (air dried basis) | Max. 10.0 |
| Net calorific value (as received basis) | Min. 4,600 kcal/kg |
| Ash fusion temperature | Min. 1,050 |
The offer given by the bidder shall be valid for the period 03 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.
Due date:
The due date for bid submission is 25 Jan’19 at 13:00 hrs (Korean Standard Time).