Korea Southern Power Co Ltd (KOSPO) a Republic of Korea power producer having its head office in Busan, Korea has published a tender for purchase of steam coal of quantity 145,000 MT for its 4,000 MW Hadong power plant, South Korea.
Each bidder is requested to offer to offer 1 CAPE in lots of 145,000MT (for shipment from any port except Newcastle) or 133,000MT (Newcastle) on FOBT basis.
The shipment shall be scheduled in July-August 2018.
Specification:
| Technical Parameter | Value |
| Total moisture (as received basis) | Max. 28 |
| Fixed carbon (air dried basis) | Max. 60 |
| Ash (air dried basis) | Max. 17 |
| Net calorific value (as received basis) | Min. 5,200 kcal/kg |
| Ash fusion temperature | Min. 1,100 |
The offer given by the bidder shall be valid for the period 3 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.
Due date:
The due date for bid submission is 24 Apr’18 at 10:00 hrs (Korean Standard Time).
For contact details and other information view TENDER SECTION

Leave a Reply