Korea Midland Power Company Limited (KOMIPO) has invited a tender for purchase of 1,280,000 MT bituminous coal for its Boryeong Power Plant, Korea.
KOMIPO previously floated the tender for purchase of 420,000 MT Coal on 8 Aug’17.
Shipping Schedule:
|
Item |
Minimum NAR |
Quantity (MT) |
Loading Schedule |
|
Colombian Only |
5,700kcal/kg |
650,000
(130,000×5) |
1st : Nov~Dec 2017 2nd to 5th : evenly spread for each quarter 2018 |
|
LCV (Single Mine) |
4,600kcal/kg |
210,000 (70,000×3) |
1st : Oct 2017 2nd : Nov 2017 3rd : Dec 2017 |
|
LCV |
4,600kcal/kg |
140,000 (70,000×2) |
Oct 2017 |
|
280,000 (70,000×4) |
1st : Nov 2017 2nd : Dec 2017 |
The price basis shall be one single fixed price based of FOBT.
The offer will remain valid for the period of 5 days from the date of tender closing. KOMIPO can request the bidder to extend validity period of bid, if necessary.
Specification:
Total moisture (as received basis) of Colombian coal: max 15%
Total moisture (as received basis) of LCV coal: max 28%
Fixed carbon (air dried basis): max 60%
Ash (air dried basis): max 17%
Due date (Korean Standard Time):
The due date for bid submission is 16 Aug’17 till 12:00 hrs.