Korea Midland Power Company Limited (KOMIPO) has invited a tender for purchase of 640,000 MT HCV and 490,000 MT LCV bituminous coal for its Boryeong Power Plant, Korea.
Supply of coal for any shipment from more than one mine is not allowed. It should be from single mine only.
Shipping Schedule
| Material | Minimum NAR | Quantity (MT) |
Shipping Schedule |
| HCV | 5,700 kcal/kg | 390,000 (130,000×3) |
April’17 |
| 250,000 (125,000×2) |
May or June’17 | ||
| LCV | 4,600 kcal/kg | 210,000 (70,000×3) |
April’17 |
| 280,000 (70,000×4) |
May or June’17 |
The price basis shall be one single fixed price based of FOBT.
The offer will remain valid for the period of 5 days from the date of tender closing. KOMIPO can request the bidder to extend validity period of bid, if necessary.
Specification
Total moisture (as received basis) of HCV coal: max 15%
Total moisture (as received basis) of LCV coal: max 28%
Fixed carbon (air dried basis): max 60%
Ash (air dried basis): max 17%
Due date (Korean Standard Time)
The due date for bid submission is 10 Feb’17 till 14:00 hrs.

Leave a Reply