Korea East-West Power Co. Ltd (EWP), having its head office in Ulsan, Korea,
issues a tender for purchase of 70,000 MT steam coal for Dangjin Power Plant. The delivery of the material is required in May’18.
The offer will be valid for the period of 15 days from the date of tender closing. EWP can request the bidder to extend validity period, if necessary.
Specification:
| Technical Parameters | Value |
| Total moisture (as received basis) | Max. 28 |
| Fixed carbon (air dried basis) | Max. 60 |
| Ash (air dried basis) | Max. 10 |
| Net calorific value (as received basis) | Min. 4,600 kcal/kg |
| Volatile Matter | 22~45 |
| Total Sulphur | Max. 1.0 |
| Grindability (HGI) | Min. 42 |
| Nitrogen (Dry ash free basis) | Max. 2.4 |
Due date:
The due date for submitting tender document is 11 Jan’18 up to 11:00 hrs (Korean Standard Time).
For contact details and other information view TENDER SECTION