Iranian steelmakers posted a 7.5% y-o-y growth in semi-finished steel output to 15.27 mn t during the first three months of the current Persian year (20 Mar’20-20Jun’20), according to the Iran Steel Producer Association (ISPA).
DRI production increased by 12% y-o-y
Iran posted a 12% growth in DRI output to 8.13mn t against 7.27 mn t produced during the same period last year.
Major DRI producers during the period were Mobarekah Steel Company which produced 2.01mnt, posting a growth of 3% y-o-y. Khouzestan Steel Company was the second largest DRI producer which grew output at 15% y-o-y at 1.25mnt.
Other major producers include Chadormalu Mining and Industrial Company (0.42 mn t), South Kaveh Steel (0.42 mnt), Gol Gohar-1 (0.41mn t), HOSCO (0.40mn t) and Saba Steel (0.40 mn t).
Billet and bloom production fall
Billet and bloom production fell by 3% to around 4.12 mn t.
Major billet and bloom producers were Mobarakeh Steel Company. which produced 2.60mn t, lower by 10% y-o-y.
Khouzestan Steel Company was the second largest producer of billet and bloom, with an output of 1.02 mn t, a growth of 4% y-o-y.
Esfahan Steel Company was the third largest producer, followed by Chadormalu and South Kaveh Steel with production of 0.59 mn t, 0.25 mn t and 0.23mn t respectively.
Iran produced 3.01 mn t slab during the period, higher by 12% compared with 2.70 mn t produced in the same period last year.
Finished steel production plunged by 2% y-o-y
Iran’s finished flat steel output grew by 1% y-o-y at 5.33 mn t. HRC output was 2.29 mn t, CRC output was 0.65 mn t, colour-coated steel at 0.32 mn t and other steel at 2.06 mn t in this period.
Finished long steel production was at 2.66 mn t, including beam (0.30 mn t), rebar (2.17 mn t) and structure (0.19 mn t).
| Commodity | Production First 3 Months of Previous Iranian Year(20 Mar- 20 Jun’19) | Production First 3 Months of Current Iranian Year(20 Mar- 20 Jun’20) | y-o-y |
| Beam | 301,000 | 297,000 | -1.00% |
| Rebar | 2,058,000 | 2,171,000 | 5.00% |
| Structures | 203,000 | 193,000 | -5.00% |
| Total Finished Long Steel | 2,562,000 | 2,661,000 | 3.86% |
| HRC | 2,282,000 | 2,294,000 | 1.00% |
| CRC | 650,000 | 655,000 | 1.00% |
| Coated Steel | 428,000 | 322,000 | -25.00% |
| Other Steel | 1,911,000 | 2,064,000 | -1.00% |
| Total Finished Flat Steel | 5,271,000 | 5,335,000 | 1.00% |
| Billet and Bloom | 4,233,000 | 4,120,000 | -3.00% |
| Slab | 2,696,000 | 3,015,000 | 12.00% |
| DRI | 7,272,000 | 8,133,000 | 12.00% |
| Total Semi Finished Steel | 14,201,000 | 15,268,000 | 7.51% |
Quantity in t
Source: ISPA

Leave a Reply