L&T Construction has bagged a contract from Delhi Metro Rail Corporation Limited for design and construction of the underground metro project Phase-1 in Patna. The project includes a 6 km-long twin tunnel, a cut and cover tunnel, an underground ramp at Rajendra Nagar and six underground metro stations along with other associated structures. The project is scheduled to be completed within 42 months.

Leave a Reply