- NMDC Donimalai: 16,000 t lumps (10-40 mm, Fe 57%) and 32,000 t fines (Fe 57%) on 3 Jun’25.
- BKG Mining: 44,000 t lumps (10-40mm, Fe 40-62.5%) at base price INR 780-4,540/t on 3 June.
- NMDC Kumaraswamy: 104,000 t lumps (10-40 mm, Fe 59.54-63.91%) and 92,000 t fines (Fe 60.52-63.97%) on 4 June.
- RPCL: Beneficiated fines – 3,700 t ( Fe 60.3%) at INR 4,750/t and 5,000 t (Fe 63%) at INR 5,600/t on 4 June.

Leave a Reply