- BKG Mining has scheduled an auction of 80,000 t iron ore (Fe46-63.5%) from its Haddinapade mines at floor prices of INR 850-3,125/t.
- Nadeem Minerals has scheduled an auction of 60,000 t iron ore (Fe35.03-44.84%) from Donimalai mines. The floor prices for the auction have been set at INR 500-765/t.
- Prices will be exclusive of royalty, DMF, and NMET charges.

Leave a Reply