- Eramet, a leading manganese ore producer, posted robust H1CY’24 results with a 33% y-o-y increase in production at 3.5 mnt.
- Transported volumes rose by 12% y-o-y to 3.2 mnt in Gabon, overcoming H1CY23’s logistical setbacks.
- Annual transported ore volumes in Gabon are now projected between 7.0 and 7.5 mnt, reflecting the strong transport performance in H1.

Leave a Reply