China’s Shagang Steel plans to shut down 100 t electric furnace and 180 t converter for 12-day maintenance in early Sep’20, which would affect the total steel output of 42,000 t and 78,000 t respectively. Besides, a wire rod production line and a rebar production line is also scheduled to go under maintenance in mid-Sep’20, as per some Chinese media reports.

Leave a Reply