- Rio Tinto has reported 8% lower aluminium production at 0.7 mnt in the Q1CY’22 as against the same period last year.
- Production dropped due to reduced capacity at the Kitimat smelter in British Columbia following a strike which commenced in Jul’21. Operations may resume in Jun’22.
- However, bauxite production at 13.6 mnt in Q1CY’22 remained stable as against the corresponding period of last year.

Leave a Reply