Korea Midland Power Company Limited (KOMIPO) has published a tender for purchase of 80,000 MT Anthracite Coal for Seocheon Power Plant, Korea.
The shipping of the material is scheduled in Oct’16 and the price basis is one single fixed price based of FOBT or CFR Incheon.
The offer will be valid for the period of 5 days from the date of tender closing. KOMIPO can request the bidder to extend validity period of bid, if necessary.
Specification
Total moisture (as received basis): max 15%
Volatile matter (dry, mineral-matter-free basis): 10 to 14%
Ash (air dried basis): max 45%
Grindability (HGI): 45 min
Net calorific value (as received basis): 4,600 to 6,000 kcal/kg
Nitrogen (dry ash free basis): 2% max
Ash fusion temperature: 1,250o C min
Due date
The due date for bid submission is 19 Sep’16 at 14:00 hrs (Korean Standard Time).