RINL has invited bids to procure 150,000 t of imported boiler coal in three equal shipments of 50,000 t each. The material should be delivered from a single source having calorific value of 5,500 kcal/kg. Bid evaluation would be carried out on the basis of price quoted on FOB basis, along with freight rates for both Vizag and Gangavaram ports. The last date of bid submission is 7 Jul’22.

Leave a Reply