China’s Tangshan has ordered some steel mills to shut down their sinter machines in order to improve the air quality during Aug-Sep ’20. Mills in Qin’an city need to shed their blast furnace’s production load by 30% between evening 8.00 p.m. to early morning 6.00 a.m. They also need to reduce the shutdown proportion of pelletizing by 30% until further order.

Leave a Reply