Iran: Semi-finished steel output increases in Mar-Jun

Iranian steelmakers posted a 7.5% y-o-y growth in semi-finished steel output to 15.27 mn t during the first three months of the current Persian year (20 Mar’20-20Jun’20), according to the Iran Steel Producer Association (ISPA).

DRI production increased by 12% y-o-y

Iran posted a 12% growth in DRI output to 8.13mn t against 7.27 mn t produced during the same period last year.

Major DRI producers during the period were Mobarekah Steel Company which produced 2.01mnt, posting a growth of 3% y-o-y. Khouzestan Steel Company was the second largest DRI producer which grew output at 15% y-o-y at 1.25mnt.

Other major producers include Chadormalu Mining and Industrial Company (0.42 mn t), South Kaveh Steel (0.42 mnt), Gol Gohar-1 (0.41mn t), HOSCO (0.40mn t) and Saba Steel (0.40 mn t).

Billet and bloom production fall

Billet and bloom production fell by 3% to around 4.12 mn t.

Major billet and bloom producers were Mobarakeh Steel Company. which produced 2.60mn t, lower by 10% y-o-y.

Khouzestan Steel Company was the second largest producer of billet and bloom, with an output of 1.02 mn t, a growth of 4% y-o-y.

Esfahan Steel Company was the third largest producer, followed by Chadormalu and South Kaveh Steel with production of 0.59 mn t, 0.25 mn t and 0.23mn t respectively.

Iran produced 3.01 mn t slab during the period, higher by 12% compared with 2.70 mn t produced in the same period last year.

Finished steel production plunged by 2% y-o-y

Iran’s finished flat steel output grew by 1% y-o-y at 5.33 mn t. HRC output was 2.29 mn t, CRC output was 0.65 mn t, colour-coated steel at 0.32 mn t and other steel at 2.06 mn t in this period.

Finished long steel production was at 2.66 mn t, including beam (0.30 mn t), rebar (2.17 mn t) and structure (0.19 mn t).

Commodity Production First 3 Months of Previous Iranian Year(20 Mar- 20 Jun’19) Production First 3 Months of Current Iranian Year(20 Mar- 20 Jun’20) y-o-y
Beam                                         301,000                                       297,000 -1.00%
Rebar                                      2,058,000                                   2,171,000 5.00%
Structures                                         203,000                                       193,000 -5.00%
Total Finished Long Steel                                      2,562,000                                   2,661,000 3.86%
HRC                                      2,282,000                                   2,294,000 1.00%
CRC                                         650,000                                       655,000 1.00%
Coated Steel                                         428,000                                       322,000 -25.00%
Other Steel                                      1,911,000                                   2,064,000 -1.00%
Total Finished Flat Steel                                      5,271,000                                   5,335,000 1.00%
Billet and Bloom                                      4,233,000                                   4,120,000 -3.00%
Slab                                      2,696,000                                   3,015,000 12.00%
DRI                                      7,272,000                                   8,133,000 12.00%
Total Semi Finished Steel                                   14,201,000                                 15,268,000 7.51%

Quantity in t

Source: ISPA


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *