Taiwan: Taipower Tender for Purchase of 480,000 MT Coal

The Taiwan Power Company (Taipower) is a state-owned electric power utility providing electric power to Taiwan and off-shore islands of Republic of China, has invited a open tender for purchase of 480,000 MT general sub-bituminous coal.

General conditions:
The material shall be shipped by 6 Panamax size vessels, carrying 80,000 MT+/-10%.
Bidder may offer one or more shipments.
The bid bond is USD 80,000 or TWD 2,596,000 per shipment.

Delivery Schedule:

Shipment No

Vessel Size

Nominal Ship Loads

Delivery period at Loading Port

1

Panamax

80,000

28-12-17

~

06-01-18

2

Panamax

80,000

09-01-18

~

18-01-18

3

Panamax

80,000

21-01-18

~

30-01-18

4

Panamax

80,000

02-02-18

~

11-02-18

5

Panamax

80,000

14-02-18

~

23-02-18

6

Panamax

80,000

26-02-18

~

07-03-18

Normal Ship Loads in Metric Tonnes.

Specification:

Technical parameters Value
Gross calorific value 5,000 kcal/kg min
Total moisture 28% max
Ash content 8% max
Sulfur content 0.9% max
Volatile matter 28% min
Fixed carbon 60% max
Mercury content 0.12 mg/kg max

Tender schedule:

Bid submission due date: 26 Sep’17 at 17:00 hrs (Taipei time)
Bid opening date: 27 Sep’17 at 9:30 hrs (Taipei time)
For contact details view tender section:
http://www.steelmint.com/tender/global-tender-for-purchase-of-bituminous-coal-8392


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *