Korea Midland Power Company Limited (KOMIPO) has published a tender for purchase of 140,000 MT LCV (4,600 kcal/kg) bituminous coal for its Boryeong Power Plant, Korea.
The shipping of the material is scheduled from Feb’17 to Mar’17 and the price basis shall be one single fixed price based of FOBT.
The offer will be valid for the period of 5 days from the date of tender closing. KOMIPO can request the bidder to extend validity period of bid, if necessary.
Specification
Total moisture (as received basis): 28% max
Volatile matter (air dried basis): 22 to 45%
Fixed carbon (air dried basis): 60% max
Ash (air dried basis): 17% max
Gross calorific value: 4,600 kcal/kg min
Due date (Korean Standard Time)
The due date for bid submission is 25 Nov’16 till 14:00 hrs.

Leave a Reply