SAIL auctioned 32,000 t of iron ore from its Odisha mines on 22 Apr’26, with the entire volume booked.
- SAIL Bolani: 12,000-t CLO (Fe 63.1%) at INR 6,420/t.
- SAIL Barsua: 20,000-t CLO (Fe 60%) at INR 5,800-5,850/t.
Prices were on ex-mines basis for Bolani while on FOR loaded into rake transport basis for Barsua. Prices include royalty, DMF, NMET, and extra premium.

Leave a Reply