Godawari Power & Ispat Ltd (GPIL) has resumed operations at its 1.8 mnt/year iron ore pellet plant in Raipur, Chhattisgarh, from 30 Oct’25. Production loss of nearly 150,000 t was reported during the downtime. However, it was stated that annual production targets are expected to be achieved without further maintenance shutdowns. Notably, GPIL’s pellet offers are expected to resume from 1 Nov at INR 10,200/t exw.

Leave a Reply