Korea Southern Power Co Ltd (KOSPO) has published two separate tenders for the purchase of steam coal of quantity 74,000 MT each at Hadong Power Plants, South Korea. The item specification is same in both the tenders.
The shipment of the first tender is scheduled on Nov’16 on CFR basis and second tender is on Dec’16 on FOBT basis. Russian mines coal are not accepted in the second tender.
The offer validity is of 3 business days from the date of tender closing. KOSPO can request the bidder to extend validity period of bid, if necessary.
Upon request by KOSPO, bidder shall provide relevant supporting documents including certificates, issued by the relevant authorities of the exporting country, to demonstrate the legal status and current situation of the coal mine from which the coal would be supplied.
Specification
Total moisture (as received basis): 28% max
Fixed carbon (air dried basis): 60% max
Ash (air dried basis): 17% max
Net calorific value (as received basis): 4,600 kcal/kg min
Ash fusion temperature: 1,100°C
Due date
The due date of both the tenders is 8 Sep’16 at 14:00 hrs (Korean Standard Time)

Leave a Reply