In Aug’25, MOIL’s manganese ore production increased to 0.145 mnt, reflecting an 17% y-o-y growth. During the Apr-Aug’25 period, the company achieved a 9.3% rise in production to 0.792 mnt compared to the same period last year. Additionally, exploratory core drilling activity advanced to 50,621 metres, up 8.6% y-o-y.

Leave a Reply