In Jul’25, MOIL’s manganese ore production increased to 0.145 mnt, reflecting an 11% y-o-y growth despite challenging weather conditions. During the Apr-Jul’25 period, the company achieved a 7.8% rise in production to 0.647 mnt compared to the same period last year. Additionally, exploratory core drilling activity advanced to 43,215 metres, up 11.4% y-o-y.

Leave a Reply