Korea South-East Power Company Limited (KOEN) has published a tender for purchase of 1.32 MnT sub-bituminous coal in total three years for KOEN power plant, South Korea.
The quantity required for the first, second and third year is 520,000 MT, 480,000 MT and 320,000 MT respectively. In first year, the GCV of coal should be 5,700 kcal/kg. While in second and third year the GCV of coal should be 4,600 kcal/kg.
The shipping of the product is scheduled from Aug’16 to Dec’18 at fixed price. The offer will be valid for the period of 15 days from the date of tender closing. KOEN can request the bidder to extend validity period of bid, if necessary.
Specifications:
| Item | First Year | Second & Third Year |
| Total moisture (As received basis) | 15 % max | 30 % max |
| Ash (Air dried basis) | 17 % max | 17 % max |
| Sulphur (As received basis) | 1.0 % max | 1.0 % max |
| Gross calorific value (As received basis) | 5,700 min kcal/kg | 4,600 min kcal/kg |
| Nitrogen (Dry ash free basis) | 2.4 % max | 2.4 % max |
| Ash fusion temperature | 1,200°C min | 1,050°C min |
Note: Russian coal is not allowed in first two years.
Due date
The bid document should arrive before 11:00 hrs on 21 June’16 (Korean Standard Time).