Udupi Power Corporation Limited (UPCL), a Lanco group Company, has floated a tender for supply of imported Steam coal for its power plant at Udupi (Karnataka) on CIF basis.
UPCL intends to procure 3 MnT imported Steam coal through two separate bids (each for quantum of 1.5 MnT) for its 1200 MW (2 X600 MW) Udupi Power Project at Yelluru, Udupi District, Karnataka.
General Conditions
- Bidders can quote in multiple of 0.5 MnT pa. However, minimum quantity of 0.5 MnT should be from single source
- Bidder shall be ‘Established Coal Producer’ with an annual production capacity in preceding 3 years i.e. from FY12-FY14 of 1/2/3 MnT respectively in accordance with the offered quantity of 0.5/1.0/1.5 MnT respectively
Or
Bidder shall be a ’Regular Supplier’ of bulk quantity of coal having supplied annually more than 0.5/1.0/1.5 MnT respectively in accordance with the offered quantity of 0.5/1.0/1.5 MnT during preceding 3 years i.e. FY12-FY14
- Bidders should have past experience in supplying coal directly or through PSUs to power/cement/steel/fertilizers/utilities anywhere in the world
Specification
- Imported Steam coal
- Gross Calorific Value (GCV): 5,350-6,250 Kcal/kg
- Moisture (as received basis): 15.5% max
- Ash (air dried basis): 12% max
- Sulphur (air dried basis): 0.8 % max
Quantity: 3 MnT
Important Time & Date
- Bid submission due date: 13.00 hrs IST on 08 Dec, 2014
- Bid opening date: 16.00 hrs IST on 08 Dec, 2014