Korea Midland Power Company Limited (KOMIPO) is inviting bid for purchase of Bituminous Coal for its Boryeong power plant in South Korea.
KOMIPO is looking for Australian, Canadian, S. African, Colombian or Russian Coal.
Eligibility
- Supplied Coal should be from single mines, Shipment of Coal from more than one mine shall not be considered
- Bidder shall have experience of supplying 300,000 MT Coal with 5 (five) generation subsidiaries of KEPCO, Tai-power and Japanese power utilities including J-Power can participate in this bid
- Bidders who did not have experience of supplying Coal in above motioned subsidiaries for past 3 years cannot participate in this tender
Specification
- Gross Calorific Value (NAR): 5,700 Kcal/Kg min
- Total Moisture (as received): 15% max
- Ash (Air Dried): 17% max
- Volatile Matter (Air Dried): 22-26 max
- Fixed Carbon (Air Dried): 60% max
Material Details:
Required quantity should be supply in two shipment lots:
|
S. No. |
Grade (NAR min) |
Contract Period |
Yearly Quantity (MT) |
|
1 |
5,700 kcal/kg |
Oct’14 ~ Mar’17 |
250,000 (In case of Australian, Canadian, S. African & Colombian Coal) |
|
2 |
5,700 kcal/kg |
Oct’14 ~ Mar’17 |
280,000 (In case of Russian Coal) |
Total Quantity: 250,000-280,000 MT
Price: One single fixed price based on FOBT only
Unloading Port: The Coal shall be discharged at Boryeong plant port unless otherwise notified to bidders.
Bid Submission Due Date: 11.00 hrs on 03 Jul, 2014 (Korean Standard Time)
About KOMIPO: KOMIPO is one of the subsidiaries of Korea Electric Power Corporation (KEPCO), which is a South Korea based electric producer. KEPCO is the largest electric supplier company comprises of 6 power producing companies. It’s Coal, nuclear power and wind power plant covered more than 90% of power production in Korea.