India: DPL floats Tender for Procurement of Imported Coking Coal

Durgapur Projects Ltd (DPL), a government entity, floats tender for purchase of various grades of imported Coking Coal for Coke oven group of plants.

Tenders shall be considered on the basis of Landed Cost per MT of Dry Coal at DPL.

Material Details

    Type of Coal

Specifications

Quantity(MT)

Hard Coking Coal

Moisture:10-12%

Ash: 9.5-10.5%

VM: 19-27%

50,000

Soft Coking Coal

Moisture:10.0 Max

Ash: 10.0 max

VM: 25-28%

20,000


Total Quantity:
70,000 MT
 

Delivery/Lifting: Ex-stock 

Delivery Period: Two rakes per week shall be considered for delivery, within 10 days after placement of order. 

Mode of Dispatch

  • The material shall be dispatched from the port through rail to DPL on freight paid basis
  • Bidders shall be responsible for transportation of materials for timely supply of the same

 Important Dates & Time

  • Bid submission due date: Before 11.00 hrs on 03 May, 2014 
  • Opening date: 12:00 hrs on 03 May, 2014