India: DPL invites Bid for Supply of Coking Coal

Durgapur Projects Limited (DPL), a Government of West Bengal Enterprises invites tender for supply of low ash Metallurgical Coking Coal from bonafide & resourceful importers/suppliers on ex-stock and delivery at DPL site.

Material shall be loaded into wagons on domestic sale basis from any place or port in India.

Specification of Coal

Parameters

Acceptable

Moisture

10-12%

Ash

9.50-10.5%

Volatile Matter

19-27%

Sulphur

0.6-0.8%

Phosphorous (ADB)

0.04-0.06%

CSN

5-9 STD

Fluidity

150-2,000 (DDPM)

Vitrinite Content

45% Min

V9-V14

60% Min

MMR

1.05-1.36%

 

If the above specification for the supplied material is not met, the consignment will be rejected.

Quantity: 50,000 MT ± 10%

Delivery Period

Material delivery will be started within 10 days after the order is placed  at the rate of two (02) rakes every week on delivery clearance from DPL.

Mode of Dispatch

Materials shall be dispatched by Rail from the port/place of dispatch to DPL site on freight paid basis.

Important Time & Dates

  • Bid submission due date: Before 11.00 hrs IST on 03 Mar, 2014
  • Bid opening date: 12.00 hrs IST on 03 Mar, 2014

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *