Korea Midland Power Company Limited (KOMIPO) has invited a tender for purchase of 1.5 MnT Bituminous Coal to be used at Boryeong Power Plant & Shin Boryeong Power Power Plants.
The Coal is to be delivered on a fairly evenly spread basis in each Contract Year (“CY”) starting from September 2019.
The price basis shall be one single fixed price based of FOBT and the Discharge Port will be Boryeong Plant or Shin Boryeong Port unless otherwise notified by KOMIPO.
Specifications:
| Item | LT02 | LT03 |
| Total Moisture | Max. 15 | Max. 28 |
| Ash | Max 17 | Max 17 |
| Total Sulfur | Max 0.5 | Max 0.4 |
| Gross Calorific Value | kcal/kg Min 5,700 | kcal/kg Min 4,600 |
Shipping Schedule: Bids must indicate the bidders’ preferred Delivery Periods (of thirty (30) consecutive days or calendar months) within the relevant Shipment Schedule.
Due date (Korean Standard Time): The due date for bid submission is 27 June’19 till 14:00 hrs.