Korea Southern Power Co Ltd (KOSPO) has published a tender for purchase of steam coal of quantity 480,000 MT for Samcheok power plant, South Korea.
Each bidder is requested to offer max 320,000 MT in lots of 80,000 MT on FOBT basis.
Deliveries of coal shall begin from November 2018 and shall continue thereafter till December’18.
.
Specification:
| Technical Parameter | Value |
| Total moisture (as received basis) | Max. 43 |
| Fixed carbon (air dried basis) | Max. 60 |
| Ash (air dried basis) | Max. 4.5 |
| Net calorific value (as received basis) | Min. 3,700 kcal/kg |
| Ash fusion temperature | Min. 1,050 |
The offer given by the bidder shall be valid for the period 3 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.
Due date:
The due date for bid submission is 11 Oct’18 at 14:00 hrs (Korean Standard Time).