The Taiwan Power Company (Taipower) is a state-owned electric power utility providing electric power to Taiwan and off-shore islands of Republic of China, has invited a open tender for purchase of 480,000 MT bituminous coal.
General conditions:
The material shall be shipped by 6 Panamax size vessels, carrying 80,000 MT+/-10%.
Bidder may offer one or more shipments.
The bid bond is USD 80,000 or TWD 2,540,000 per shipment.
Coal should be of Australia, Canada, Chinese Mainland, the Republic of Colombia, South Africa, the United States and Venezuela origin.
Delivery Schedule: July 2017 through October 2018
Specification:
| Technical parameters | Value |
| Gross calorific value | 6,200 kcal/kg min |
| Total moisture | 15% max |
| Ash content | 14% max |
| Sulfur content | 0.7% max |
| Volatile matter | 26% min |
| Fixed carbon | 60% max |
| Mercury content | 0.12 mg/kg max |
Tender schedule:
Bid submission due date: 19 Jul’18 at 17:00 hrs (Taipei time)
Bid opening date: 20 Jul’18 at 9:30 hrs (Taipei time)
For Contact and Other Details CLICK HERE

Leave a Reply