Korea Southern Power Co Ltd (KOSPO) has published a tender for purchase of steam coal of quantity 640,000 MT for Samcheok power plant, South Korea.
Each bidder is requested to offer min 320,000 MT in lots of 80,000 MT on FOBT basis.
The shipment shall be scheduled in July-August, 2018.
Specification:
| Technical Parameter | Value |
| Total moisture (as received basis) | Max. 43 |
| Fixed carbon (air dried basis) | Max. 60 |
| Ash (air dried basis) | Max. 4.5 |
| Net calorific value (as received basis) | Min. 3,700 kcal/kg |
| Ash fusion temperature | Min. 1,050 |
The offer given by the bidder shall be valid for the period 3 days from the date of tender closing. Although if necessary KOSPO can request the bidder to extend validity period of bid.
Due date:
The due date for bid submission is 18 May’18 at 14:00 hrs (Korean Standard Time).
For contact details and other information view TENDER SECTION